top of page
MH_MGWMC_Dawn_Exterior
MH_MGWMC_Entrance_Final
MH_MGWMC_Lobby_Front_Desk
MH_MGWMC_Suite_Dining_Area
Marriott 9-25-15-6
Marriott 9-25-15-1
Marriott 9-25-15-7
Marriott 9-25-15-8
MH_MGWMC_Spa
MH_MGWMC_MClub_Patio_Day
MH_MGWMC_MClub_Lounge_Evening
MH_MGWMC_MClub_Lounge
MH_MGWMC_MClub_2
MH_MGWMC_Lobby_TV_Lounge
MH_MGWMC_Lobby_Starbucks_Seating
MH_MGWMC_Lobby_Starbucks
MH_MGWMC_Lobby_Overview
MH_MGWMC_Lobby_Business_Center
MH_MGWMC_Fitness_Center
MH_MGWMC_Exterior_GM_Request_Headlights_
MH_MGWMC_Exterior_Daytime
MH_MGWMC_Starbucks_Patio
MH_MGWMC_Exterior_Monongahela_River

Morgantown Marriot at

Waterfront Place Hotel

Morgantown, WV

 

Owner: Minsyr-Oxbridge, LLC

Completed: Spring 2017

Cost: $16.3 Million

Contractor: Hyphen Construction Group

The Morgantown Marriott at Waterfront Place Hotel construction had to be phased to minimize the disruption of public circulation and exiting throughout the building.  Plus, the desire to keep a significant number of guestrooms occupiable, either existing or new rooms, required phasing.  A plan was executed to renovate one side of the lobby and separate it from the other, but still allow freedom to safely exit.  We received life safety approval from the local fire marshal before executing the proposed phasing plans.

This 207-room renovation involved a complete transformation from the original traditional appearance to a contemporary European-inspired design.  The entrance lobby was converted into a large open space which boasts a Starbucks, live edge bar, peninsula glass enclosed fireplace and penny mosaic pizza oven.  The second floor houses an executive lounge and private exterior patio with gas fire pit.  Each guestroom now has updated finishes, fabrics, and fixtures consistent with a contemporary European-inspired experience.

bottom of page